Replacement of 110 kV double-circuit overhead line with 110 kV cable lines in Šiauliai City from 330/110/10 kV Šiauliai TS to 110/10 kV Zuokniai TS and installation of a new communication channel when laying fibre-optic cable next to cable lines.
Newly installed 110 kV cable line from the existing 110 kV overhead line to a newly built 110/10 kV Meiluškiai TS and the replacement of the break-off support on the 110 kV overhead line due to cable connection.